menu_web

my_menu_bird

LTE E-UTRA UL Scheduled Operation (Link Adaptation)

• UE sends SR (Scheduling Request – part of Uplink Control Information), BSR (Buffer Status Report) and PHR (Power
Headroom Report) on PUCCH (or starts random access if no PUCCH is configured).
• Scheduler at E-NodeB dynamically allocates UL resources to UE:
– Grant is assigned to UE on PDCCH.
– Assigned resources (PRB and MCS) are communicated to the UE.
• UE sends user data on PUSCH.
• If E-Node B decodes the Uplink data successfully, it changes the New Data Indicator (NDI) on PDCCH, and/or

PUCCH Physical Uplink Control Channel sends ACK/NAKs on PHICH.
PDCCH Physical Downlink Control Channel
PUSCH Physical Uplink Shared Channel
PHICH Physical HARQ ACK/NAK Indicator Channel





E-UTRA Uplink Scheduled Operation

The following information is transmitted by means of the Downlink Control Information (DCI) format 0 on PDCCH
for the scheduling of PUSCH:
􀁺 Flag for format0/format1A differentiation
􀁺 Hopping flag
􀁺 Resource block assignment and hopping resource allocation
􀁺 Modulation and coding scheme and redundancy version
􀁺 New Data Indicator (NDI)
􀁺 TPC command for scheduled PUSCH
􀁺 Cyclic shift for DM RS
􀁺 CQI request – 1 bit
The details about grant value and its relationship to PUSCH power can be found in TS36.213 § 5.1.1.1.
The UE ACK-NAK procedure is described in TS36.213 § 8.3.
New Data Indicator (NDI) can be found in the Downlink Control Information (DCI) format 0 on PDCCH together with
the Uplink scheduling assignment.
HARQ ACK/NAKs are sent on the Downlink PHICH. Retransmissions shall be needed if the NDI has not changed or
if PDCCH is not detected.
Uplink Scheduling at E-Node B is based on:
􀁺 Serving Cell Uplink Noise Rise (Rise-over-Thermal)
􀁺 Overload Indicators from other E-Node Bs
􀁺 UE Scheduling Requests (SR)
􀁺 UE Buffer Status (BSR)
􀁺 UE Power Headroom Report (PHR)

􀁺 UE Capabilities